Electrical case study · Chigwell, IG7

Vorsprung Alpha Max EV Charger Installation in Chigwell IG7

80A Supply Assessment • Dedicated EV Circuit • Bonding Upgrade • UKPN Notification Completed

  • ✓ 80A BS1361 Supply Verified
  • ✓ Diversified Load Assessed
  • ✓ Dedicated EV Circuit Installed
  • ✓ UKPN Notification Submitted

A recommendation-based enquiry brought Eco Tech Electrical to a priest living at a residential property associated with a church in Chigwell IG7. He had recently purchased an electric vehicle and wanted professional guidance on choosing a suitable charger.

The customer left the charger selection and technical decisions to Eco Tech Electrical. Before making a recommendation, we assessed the existing supply, earthing, bonding and electrical demand.

Following the assessment, we recommended the Vorsprung Alpha Max and completed the dedicated circuit design and installation, testing, certification, commissioning and UKPN notification.

  • Location: Chigwell, IG7
  • Property: Residential property associated with a church
  • Charge point: Vorsprung Alpha Max, 7.4kW, Type 2 tethered
  • Enquiry: Recommendation
Completed Vorsprung Alpha Max 7.4kW Type 2 EV charger installation in Chigwell IG7.

The Customer's Requirement

The customer had recently purchased an electric vehicle and wanted a professionally installed home charge point. He had no preference regarding charger make or model and was unsure what would be appropriate for his vehicle and property. Rather than select a product first and ask for it to be fitted, he wanted the work managed from recommendation through to commissioning.

Eco Tech Electrical was asked to recommend a charger based on the vehicle’s charging requirements, the installation requirements at the property and the electrical capacity available. That meant confirming the suitability of the existing installation before making a product recommendation, then taking responsibility for the circuit design, installation, verification and handover.

Initial site survey

The recommendation-based enquiry was treated first as an assessment of the property, not simply a request to install a preselected unit. The customer had no preferred make or model and relied on Eco Tech Electrical to advise on the charger and technical approach. Before making that recommendation, we examined the existing installation and supply so the proposed charging load could be considered in context.

A 7.4kW single-phase charge point can draw up to 32A, depending on operating conditions. This represents a significant sustained demand: unlike an appliance that may run briefly, an EV charger can draw current for an extended charging session while other household loads are operating. Before adding that load, it is important to check whether the existing supply has suitable capacity and whether the installation’s earthing, bonding and protective arrangements can support the new circuit.

The site assessment verified the earthing arrangement and main protective bonding, inspected the DNO cut-out, confirmed the 80A BS1361 Type II service fuse, and assessed the existing electrical demand. Diversity calculations were applied to estimate the existing diversified load, recorded at approximately 25A. These findings informed the capacity assessment alongside the proposed EV charging load; they were not treated as a substitute for checking the circuit design and protective measures.

Each check addressed a different part of the design. Earthing verification established the protective arrangement to be considered for the charge point. Checking main protective bonding helped assess the wider installation. Inspecting the cut-out and confirming the fuse identified the incoming supply equipment, while demand assessment and diversity calculations helped determine whether the additional 32A charging load could be accommodated. An unused way in a consumer unit alone would not demonstrate that the supply or installation was suitable.

With the property assessment complete, charger selection could follow the engineering findings and the customer’s needs. The assessment indicated that the property had suitable capacity for the proposed installation, allowing us to recommend a compatible single-phase charge point and design its dedicated circuit and protection accordingly.

Earthing and supply verification

Inspection of the existing electrical supply and earthing arrangement before EV charger circuit design
Inspection of the existing electrical supply and earthing arrangement before designing the EV charging circuit.

Before selecting the charge point and protective arrangement, the incoming supply and earthing provisions were checked. The DNO cut-out was inspected and the main service fuse was confirmed as an 80A BS1361 Type II fuse. This is a recorded characteristic of this installation; it should not be read as a general indication that every property with an 80A fuse can automatically accommodate an EV charger.

Earthing verification is central to EV charge point design. The protective measures must be appropriate to the earthing arrangement and the installation conditions. A fault on equipment connected outdoors or in a location exposed to the elements must be dealt with by suitable protective measures, while the installation must also meet the relevant requirements of BS 7671, including those applicable to electric vehicle charging installations. This is why the earthing arrangement is established and assessed rather than assumed.

Main protective bonding was checked alongside the earthing. Bonding connects qualifying incoming services to the main earthing terminal to reduce dangerous potential differences under fault conditions. Its adequacy is part of understanding the existing installation and is relevant to the overall safety assessment; it is not a substitute for the charge point’s circuit protection.

Capacity was considered by looking at the 80A service fuse in context with the existing diversified load of approximately 25A and the proposed charging demand. Diversity is a design method for estimating a realistic maximum demand where not all connected loads are expected to draw their full rated current at the same time. It is not permission to ignore circuit ratings, protective device requirements or the actual use of the property. Here, the assessment indicated that the property had suitable capacity for the proposed installation.

Where the assessment of an installation or supply points to a capacity concern, the design may need to change, load management may need to be considered, or the DNO may need to be consulted about the supply. In this case, the capacity review supported proceeding with the proposed 7.4kW charge point. No additional supply measurements or capacity figures are stated here beyond the details recorded for the project.

Charger selection

Following the assessment, Eco Tech Electrical recommended a Vorsprung Alpha Max 7.4kW Type 2 tethered EV charger. The customer had no preference regarding make or model and relied on our recommendation, which took account of the vehicle’s charging requirements, the residential setting and the available electrical capacity. The charger’s single-phase compatibility suited the assessed supply arrangement, while its 7.4kW rating provided the intended home charging capability for the project.

A 7.4kW unit is a familiar format for a domestic single-phase installation. The Type 2 connector provides the connection between the charge point and a compatible vehicle. A tethered lead remains attached to the charger, which can make routine connection straightforward because the driver does not need to retrieve a separate cable for each charge. The right choice between tethered and untethered equipment depends on the customer’s preference and the vehicle’s charging arrangements.

Mobile app integration gives the customer access to supported charge point information and controls from a phone, while RFID functionality provides an access-control option using a compatible card or tag. These features address everyday use; they do not replace the required electrical protection, installation testing or safe operation. The charger was selected as a practical fit for this installation, not as a universal recommendation for every home or vehicle.

Before installation, we reviewed the manufacturer’s installation instructions to confirm the requirements for mounting, electrical connection, commissioning and protection. This ensured that the circuit and protective arrangement could be designed around the chosen equipment. A different property, supply arrangement or vehicle could lead to a different charger recommendation.

Dedicated EV circuit design

Dedicated EV charging circuit installed alongside the property's existing electrical installation
Dedicated EV charging circuit installed alongside the property's existing electrical installation.

A dedicated circuit was installed for the charge point. Giving the EV charger its own circuit avoids treating a sustained high-demand appliance as an incidental addition to an existing general-purpose circuit. The design can then address the load, cable, circuit length and installation conditions as a defined part of the electrical installation, with suitable overcurrent and residual-current protection.

Cable routing was considered in relation to the property layout, the location of the charge point and the existing electrical installation. The aim was to provide a secure route and a suitable connection while keeping the new circuit coordinated with the existing distribution equipment. Exact cable sizes, route lengths and installation methods are not stated in this case study because those details were not provided for publication; they must be determined for each installation from the actual design conditions.

Circuit design is not based on charger output alone. Relevant considerations include the expected load, the cable’s current-carrying capacity, voltage drop, the installation method, protective device coordination, fault protection and any requirements in the charge point manufacturer’s instructions. Environmental conditions and the physical route can also affect the design. These factors need to be checked together so that the installed circuit is suitable for its intended use.

Keeping the EV circuit independent also assists identification and isolation. It allows the charging equipment to be controlled and protected as a dedicated part of the installation. The circuit was coordinated with the existing installation and the separate protection enclosure, with the specific arrangement selected for this property rather than inferred from a generic diagram.

EV charger protection arrangement

Dedicated EV charger protection enclosure incorporating surge protection and circuit protection
Dedicated EV charger protection enclosure incorporating surge protection and circuit protection.

A dedicated EV charger protection enclosure was installed for the new circuit. A 40A RCBO was fitted in accordance with the manufacturer’s requirements and the project design. An RCBO combines overcurrent protection with residual-current protection in one device. Its rating and characteristics must suit the circuit, cable and connected equipment; the 40A selection recorded here is specific to this installation and should not be treated as a universal specification for every 7.4kW charger.

EV charging installations have specific requirements concerning protection against electric shock and the possible effects of DC residual current. The solution must be compatible with the particular charge point’s built-in protection and installation instructions, and must meet the applicable BS 7671 requirements. This project’s protective arrangement was selected with the manufacturer guidance in mind. The available project information does not specify a particular RCD type or internal DC protection specification, so none is claimed here.

Surge protection was installed in the dedicated protection enclosure as part of the project’s protective arrangement. The selection and application of surge protective devices should be based on the installation and applicable requirements, rather than assuming every charge point needs an identical device. The dedicated equipment also provided a clear means of isolating the EV charging circuit for appropriate work and maintenance.

Locating the EV circuit’s protective equipment in a dedicated enclosure makes its purpose clear and provides an organised arrangement alongside the existing electrical equipment. Correct identification, accessibility and coordination with the supply are all practical parts of a maintainable installation. The protection was in place before the charger was commissioned and put into service.

Installing the Vorsprung Alpha Max charger

Internal view of the Vorsprung Alpha Max EV charger showing the wiring during installation and commissioning
Internal view of the Vorsprung Alpha Max EV charger showing wiring and commissioning stage of the installation.

With the supply assessment, product choice, circuit design and protection arrangement established, the charger was mounted at the agreed position and connected to its dedicated circuit. Mounting, cable entry and wiring followed the manufacturer’s guidance, taking account of the product enclosure and the intended use of the charge point.

At the equipment, the installer followed the manufacturer’s requirements for access to the connection points, conductor preparation, termination and enclosure closure. The work included making secure electrical connections, avoiding undue strain on conductors and maintaining the enclosure’s integrity. Cable entries and terminations must not compromise the equipment’s protection against its environment.

The installation work was coordinated with the property’s existing electrical equipment. The dedicated circuit was terminated at its protective device, routed to the charge point and connected in accordance with the equipment requirements. The charger’s tethered Type 2 lead provides the connection for the vehicle. The image records the charger during the wiring and commissioning stage; it is not a substitute for the formal verification and certification completed for the circuit.

The manufacturer’s instructions had been reviewed before installation and were followed during wiring and commissioning. This matters because connection details, protection requirements and commissioning steps are product-specific. The charge point was installed in its intended configuration, with the dedicated circuit and protective enclosure coordinated with the equipment before it was energised.

Additional safety issue identified

During the inspection, an old redundant gas pipe was identified that was not bonded. Although this issue was separate from the EV charger circuit, it was relevant to the safety of the property’s electrical installation. The bonding was installed to address the issue and bring the installation into line with the requirements applicable to the work.

The distinction between a gas pipe that is an extraneous-conductive-part and a redundant, disconnected pipe can depend on its actual connection and ability to introduce earth potential. That assessment should be made on site; the presence of metal pipework alone is not enough to determine the bonding requirement. In this project, the pipe was identified during the inspection and bonding was installed as part of addressing the observed condition.

Finding and reporting an issue outside the immediate scope of the new circuit is an important part of competent electrical work. A new charger can be installed correctly while a separate defect remains elsewhere in the installation. Where a safety concern is identified, the electrician should assess it, explain its relevance to the customer, and agree appropriate remedial work rather than allowing the new installation to obscure a known issue.

This additional bonding work also demonstrates why an EV charger survey should include a review of the existing electrical installation. The new equipment has to operate within that installation, and its protective measures rely on the wider earthing and bonding arrangements being suitable. Recording and addressing a relevant issue contributes to a more complete outcome than considering only the charger mounting position and cable route.

Testing and commissioning

The charging circuit and equipment were tested before the charger was put into service. Verification included dead tests and live tests appropriate to the installation, checking polarity and the operation of protective devices, and functional checks of the charge point. Testing is an essential stage of an electrical installation: it provides evidence that the completed work has been installed correctly and that the protective measures operate as intended.

Dead testing is carried out with the relevant circuits isolated and safe to test. Depending on the circuit and design, verification can include continuity and insulation checks. Live testing is then used to establish relevant characteristics of the energised installation and to verify the operation of protective measures. The sequence and extent of testing are determined by the installation and the applicable requirements; no unrecorded test results or numerical values are presented here.

Polarity verification confirms that conductors are connected in the intended arrangement. Protective-device checks help establish that the circuit has appropriate protection and that the device operates as required. Functional testing confirms that the charge point responds correctly when energised and that its intended basic functions operate. Commissioning also follows the manufacturer’s process for preparing the unit for use.

A charger should not be handed over for routine use until the installation and commissioning checks have been completed. If testing reveals a defect or unexpected result, the cause must be investigated and resolved before the work can be treated as complete. In this project, testing and functional checks were completed before the customer began using the charger.

App setup and customer handover

Handover covered the day-to-day use of the charger as well as the completed electrical work. The mobile app was installed and the charger registered so the customer could access the available app functions. The customer was shown how to check live charging status and view charging history, subject to the app and charger features available to their account and device.

The customer was also shown the basic operating steps, including connecting the tethered Type 2 lead, starting and stopping a charging session using the available controls, and understanding the role of RFID access. The app’s controls and displays can vary as software is updated, so the handover focused on using the charger and its current app interface rather than assuming a fixed set of screens.

Explaining the protective equipment and isolation arrangements is also part of a useful handover. The customer should know which equipment serves the EV circuit and should not remove covers or attempt electrical repairs. If a protective device operates repeatedly or the charger displays a fault, the equipment should not simply be reset over and over; the issue should be investigated by a competent person.

The outcome for the customer was an installed, commissioned charge point they could use with the new vehicle, along with app-based access to charging information. The conversation at handover connected the technical work to everyday use: how the charge point operates, what the indicator or app status means, and where to find the dedicated circuit protection if the installation needs to be isolated.

Customer Feedback

“We recently engaged Eco Tech Electrical Contractors to install an electric vehicle charging point for our church vehicle. From the initial survey through to completion, the work was carried out professionally and to a very high standard.

Shashi explained the installation process clearly, installed a dedicated consumer unit, ensured all testing and certification were completed correctly, and left the area clean and tidy. The charger is working perfectly and the entire process was straightforward.

We appreciated the attention to detail, good communication, and willingness to answer any questions throughout the installation. We would be happy to recommend Eco Tech Electrical Contractors to anyone requiring EV charger installation or electrical services.”

— Verified Google Review, Chigwell IG7 EV Charger Installation

Certification and DNO notification

On completion, an Electrical Installation Certificate was issued for the installation. This documents the electrical work and its verification. The certificate should be retained with the property’s electrical records because it provides important information about the new circuit and the inspection and test results recorded for the work.

Part P notification was completed. Part P forms part of the Building Regulations in England and Wales and concerns electrical safety in dwellings. The appropriate compliance route depends on the work, its location and the installer’s arrangements. Here, notification was completed following the installation, alongside the issue of the Electrical Installation Certificate.

A UK Power Networks EV charge point notification was also submitted. DNO notification helps the distribution network operator maintain information about generation and significant new electrical loads connected to its network and supports the relevant process for the charge point installation. Notification is not the same as the electrical certificate: the certificate records the installation work, while the DNO process informs the network operator.

These records and notifications are more than administrative details. They provide a traceable completion trail for the customer and the relevant parties, and they make clear that the installation was assessed, installed, tested and commissioned rather than simply connected. The customer received the certification associated with the work, and the UKPN notification was submitted.

Project result

The project began with a customer who had an electric vehicle but no charger preference and questions about capacity, compliance and installation. The completed work addressed those questions through an assessment-led process. The 80A BS1361 Type II service fuse was verified, the existing diversified load was assessed at approximately 25A, and the property was found to have suitable capacity for the proposed charge point.

A Vorsprung Alpha Max 7.4kW Type 2 tethered charger was selected to provide a single-phase residential charging option with app support and RFID functionality. A dedicated charging circuit and protective arrangement were installed, including the 40A RCBO selected in accordance with the manufacturer guidance and surge protection measures. The charger was installed following its instructions, then tested and commissioned before use.

The survey also identified an unbonded redundant gas pipe. Bonding was installed to address this separate safety issue. At completion, the customer received an Electrical Installation Certificate, Part P notification was completed, and UK Power Networks was notified of the EV charge point installation. App setup and a practical handover enabled the customer to monitor charging information and understand basic operation.

In summary: capacity was assessed before installation; the charge point was selected to suit the property and customer; a dedicated protected circuit was provided; an additional bonding issue was dealt with; and the charger was tested, commissioned, certified and handed over.

Frequently asked questions

Do I need a dedicated circuit for an EV charger?

A home charge point is normally supplied by a dedicated circuit designed for the charger and the installation conditions. This allows the cable, protective devices, isolation and circuit capacity to be assessed specifically for the sustained charging load. The design must follow the charge point manufacturer’s instructions and the relevant requirements of BS 7671. In this Chigwell installation, a dedicated EV charging circuit was installed.

Can an EV charger be installed on an 80A supply?

An 80A service fuse does not, by itself, determine whether an EV charger can be installed. The installer must assess the existing installation, earthing and bonding, other demand, the proposed charger load and the available capacity. At this property, the service fuse was an 80A BS1361 Type II fuse and the diversified existing load was approximately 25A. The assessment found suitable capacity for this particular proposed installation; another property with the same fuse rating may have a different demand or installation condition.

What is diversity when assessing an EV charging installation?

Diversity is a design approach used to estimate maximum demand where it is unlikely that every connected load will draw its full rated current at the same time. It helps an electrician assess a property’s overall demand rather than simply adding every appliance rating at full load. It must be applied reasonably and does not replace checking cable ratings, protection, the actual use of the property or any relevant supply requirements. Diversity calculations were applied during the assessment for this project.

Why is earthing important for EV chargers?

Earthing is part of the protective measures that help ensure exposed conductive parts do not remain at a dangerous voltage during a fault. EV charge point design must take account of the existing earthing arrangement and the specific requirements for charging equipment under BS 7671. The installer should verify the arrangement rather than assume it. The earthing arrangement at this Chigwell property was checked before the circuit was designed.

Why is bonding checked during EV charger installations?

Main protective bonding is checked because the charger is being added to the property’s wider electrical installation, whose earthing and bonding arrangements contribute to safety. The survey can also reveal defects that are not part of the charger circuit but should be assessed. During this project, an old redundant gas pipe was found not to be bonded, and bonding was installed after the issue was identified.

What certification should I receive after an EV charger installation?

The appropriate electrical certification depends on the work undertaken and the applicable requirements. For this installation, an Electrical Installation Certificate was issued. Part P notification was completed as recorded for the project. Customers should retain the certificate and notification information with their property records and ask the installer to clarify any document that is expected but has not been supplied.

Do EV chargers require DNO notification?

There is a relevant network-operator process for notifying an EV charge point installation, and the applicable requirements should be checked for the location and installation. For this Chigwell project, UK Power Networks EV charge point notification was submitted. DNO notification is separate from the Electrical Installation Certificate and does not replace the required electrical design, installation or testing.

What size protection is required for a 7.4kW charger?

There is no single protective device specification that is correct for every 7.4kW charge point. Selection depends on the charger instructions, circuit design, cable and installation conditions, and the protective measures required by BS 7671. A 40A RCBO was selected for this project in accordance with the manufacturer guidance. That project detail should not be treated as a general instruction to use the same device for another installation.

Can I monitor EV charging from my phone?

Some charge points provide app functionality for viewing charging status and history or accessing other supported controls. The exact functions depend on the charger model, app, network connection and account setup. The Vorsprung Alpha Max selected for this project supports mobile app integration, and the customer was helped with app installation, charger registration and a basic demonstration of the available charging information.

How long does a home EV charger installation take?

Time on site varies according to the property, the location of the charge point, the cable route, the condition of the existing electrical installation and any remedial work or commissioning requirements. A survey is needed to understand those factors. A reliable duration should be discussed after the installer has assessed the particular property; no installation duration was recorded for this case study.

↑