Electrical case study · Buckhurst Hill, IG9

All-Electric Kitchen Extension and Sub-Main Distribution – Buckhurst Hill (IG9)

We were appointed by Lup Construction & Renovation Ltd. to deliver the electrical design and installation for an all-electric domestic kitchen extension in Buckhurst Hill. The project included a new sub-main distribution arrangement, installation of dedicated circuits, and remedial work to the property's main protective bonding.

Consumer unit ready for termination during the Buckhurst Hill kitchen extension electrical installation
  • Location: Buckhurst Hill, IG9
  • Project partner: Lup Construction & Renovation Ltd.
  • Standards: BS 7671:2018+A4:2026
  • Certification: NICEIC Electrical Installation Certificate and Part P notification

The project brief and core requirements

The client chose an entirely gas-free, all-electric kitchen configuration, requiring the electrical load and circuit layout to be planned around the new appliances and services. The installation scope included:

  • Dedicated heavy-duty circuits for cooking appliances.
  • An independent ring final circuit designated for multi-zone air-conditioning units.
  • General power, secondary distribution and bespoke kitchen lighting grids.

Engineering challenges and spatial assessments

1. Cellar suitability and ingress protection

The kitchen extension was more than 20 metres from the property's incoming electrical service cupboard. To avoid excessive voltage drop and unnecessary structural chasing, a sub-distribution arrangement was selected, with the new consumer unit located in the basement cellar.

Before confirming the position, we assessed the cellar for ambient dampness and potential water ingress to check that the location was suitable for the electrical enclosure and distribution equipment.

2. Sub-main cable routing through a restricted sub-floor

The sub-main was installed using 16mm² three-core Steel Wire Armoured (SWA) cable, protected upstream by a 50A MCB at the main board. The approximately 20-metre route required access through a restricted sub-floor space around two feet high. We routed and secured the cable to keep it clear of potential friction and damage points.

3. Additional surge protection at the cellar board

Although the main consumer unit already had surge protection, the long distance between the origin and the new distribution board can affect the protection level achieved at connected equipment. Following discussion with the building team, we installed a dedicated Type 2 Surge Protection Device (SPD) in the cellar consumer unit to provide additional protection for the kitchen's electronic equipment against transient overvoltages.

Remediating a hidden main earthing and bonding defect

During the under-floor inspection, we found that the main earthing clamp was concealed beneath the sub-floor and inaccessible for inspection and testing. Rather than introduce an inaccessible joint, we installed a new, uninterrupted 10mm² main protective bonding conductor.

The conductor was routed across the joists and out through the property's side alleyway to an accessible external gas meter box. It was terminated using a 6mm lug and a BS 951 bonding clamp.

Commissioning, testing and handover

Following completion of the second-fix work, we carried out dead and live testing using calibrated test equipment. The inspection and test sequence included checks of continuity, insulation resistance, polarity and earth fault loop impedance, as applicable to the installation.

Zs reading being taken at the consumer unit during commissioning
Earth fault loop impedance reading at the board during commissioning

After successful testing, we handed over a NICEIC Electrical Installation Certificate (EIC) and the Building Control Part P compliance notification for the completed work.

Watch the sub-floor installation process

This video shows our team working in the restricted sub-floor space to route the sub-main and protective bonding conductors at the Buckhurst Hill property.

Project-specific scope

This case study describes the design and work completed at one property. Circuit arrangements, cable sizing, protective devices, bonding requirements and certification must be assessed for each installation against its actual conditions and applicable standards.

Written and reviewed by

Written by:
Shashi Pal
Position:
NICEIC Approved QS
Qualification:
JIB Gold Card
Professional membership:
Associate Member - IFSM (8946)

Standards and project requirements

  • Electrical installationBS 7671:2018+A4:2026, as identified for this project.
  • Building regulationsPart P requirements and building-control notification, where applicable.
  • CertificationNICEIC Electrical Installation Certificate for the completed work.

Electrical work disclaimer

This case study describes work at one property in Buckhurst Hill. Circuit arrangements, cable sizes, protective devices, earthing and bonding measures, and the suitability of equipment locations depend on the installation and its conditions. The project details are not a design specification for another property.

Electrical design, installation, inspection, testing and certification should be undertaken by suitably qualified and competent persons in accordance with the requirements applicable to the work. This information is general and is not a substitute for a professional assessment.